#  System Integration Guideline 

 



## Table of Contents

[Purpose of this Document](#purpose)

[Standards Descriptions](#standards)

[Questions this Document will Address](#questions)

[System Types Included](#system)

[Related Files](#related)

**This document provides guidance to Harvard University’s minimum standards and recommended best practices for Integrated Automation of Operations Technology and Industrial Control systems design and implementation**



 

1. ## Purpose of this Document
    
    
    - To provide guidance to Harvard University’s minimum standards and recommended best practices for Integrated Automation of Operations Technology and Industrial Control systems design and implementation
    - This document outlines a process for identifying, tailoring, and implementing selected integrations.
2. ## Standards Descriptions
    
    Choose the link below to access documents containing detailed system integration standards:  
    [Harvard University Technology Standards System Integration Guideline](/file_url/260)
3. ## Questions this Document Will Address:
    
    
    - Which ICS/OT Vendors must be used for new construction, retrofit, or buildings with mixed ICS/OT platforms?
    - Expectations for A/E design firms when designing an ICS/OT Systems for Harvard University
    - Expectations for ICS/OT contractors when implementing at Harvard University
4. ## System Types Included
    
    Harvard University’s Operational Technology (OT) systems and Industrial Control (ICS) consists of the following, but not limited to:
    
    
    - Physical Access Control (access, video, intercom, duress, blue light, etc.)
    - Building Management Systems
    - Chilled Water Plants
    - Distributed Electrical Facility
    - Electric Metering
    - Electronic key management system
    - High Efficiency Energy Recovery System
    - Air Quality Systems
    - Kitchen and Lab Fume Hoods
    - Heating Hot Water Plants
    - Irrigation Systems
    - Lighting Systems
    - Photovoltaic (PV) Cells (Solar Panels)
    - Refrigeration Systems
    - Steam Plants
    - Transportation Systems
    - Space Management &amp; Occupancy Sensing (when installed as standalone)
    - Audiovisual Systems (where integration is required with other systems)



 

##  5. Related Files 

 



  [### Schneider Electric BMS by ENE Systems - Typical Graphics 51 Brattle Street - Jan 2023

 ](/sites/g/files/omnuum10526/files/enterprise/files/schneider_electric_bms_by_ene_systems_-_typical_graphics_51_brattle_street_-_jan_2023_b.pdf) 

   [### Schneider Electric BMS by ENE Systems - SEBA Point Names

 ](/sites/g/files/omnuum10526/files/enterprise/files/harvard_-_schneider_electric_bms_by_ene_systems_-_seba_point_names_-_jan_2023.xlsx) 

   [### Harvard - Siemens Desigo BMS Standards

 ](/sites/g/files/omnuum10526/files/enterprise/files/harvard_-_siemens_desigo_bms_standards_jan-2023_.pdf) 

   [### Harvard University Technology Standards System Integration Guidelines

 ](/sites/g/files/omnuum10526/files/enterprise/files/harvard_csi_division_25_bas_guidelines_-_rev_1.3a_-_for_issue_01.docx) 

   [### Operational Technology (OT) Device Connection Request Form

 ](/sites/g/files/omnuum10526/files/enterprise/files/ot-network-device-testing-plan-checklist.pdf) 

   [### Rider: Requirements for Access to and Protection of the Harvard Network

 ](/sites/g/files/omnuum10526/files/enterprise/files/rider_network_access_5.19.21.pdf) 

   [### OT Device Request Form

 ](/sites/g/files/omnuum10526/files/enterprise/files/ot-device-request-form.pdf) 

  

 

 

 

 

Sort    Version 

  1.3 

    Last Revised 

  27-Nov-2022 

    Status 

  Published 

    Document Type 

  Standard